What to Plan Before Your Electrician Starts

If you’re building or renovating, it’s easier to plan how the home should work before electrical layouts are finalised. Start with daily routines rather than a list of devices. A useful brief tells your electrician and automation designer what each room needs to do and what should still work if plans change.

All guides

Walk through a normal day

Mark where you enter each room, which lights you use at night, and where you want to adjust the blinds or temperature. In an open-plan kitchen, for example, cooking, eating and relaxing may call for different lighting. Decide which actions should work from a wall control without opening an app.

Agree what needs coordinating

  • Lighting: identify where you want dimming and where simple on/off is enough.
  • Blinds and curtains: mark the openings you want to motorise, even if some are for a later phase.
  • Climate: identify the rooms you want to control separately and share the proposed heating and cooling equipment.
  • Network and equipment: agree where the control equipment and network equipment can be installed and accessed later.
Open automation control cabinet with rows of control modules and organised cabling
Control cabinet from the Luxury Villa project. Agree where equipment will go and how it can be reached for servicing before the electrical layout is finalised.

Before walls and ceilings close

Review the latest floor plans and equipment schedules together. Record decisions, unresolved items and who is responsible for each one. If the fit-out will happen in phases, identify which provisions need to be agreed now and which equipment can wait. Leave wiring and compatibility decisions to the project professionals.